Traffic on the Oconee Connector will be greatly restricted beginning at 7 p.m. today (9/18/2026) as Archer Western Construction begins work on mid-span vertical supports for the two bridges that will carry SR 316 over the Connector.
The current four lanes of traffic now moving through the intersection in each direction will be cut to two lanes, one for through traffic and one for left-hand turns.